menu
Bitumen Melting Equipment
Bitumen Melting Equipment

Bitumen Melting Equipment

CONTACT NOW
Bitumen Melting Equipment VIDEO
Features Main Parameters Construction Case Related Products


Brief introduction of Bitumen Melting Equipment

DJT4Y Hydraulic bitumen melting equipment is developed by  Metong on the base of our old model DJT4  Bitumen melting equipment. It also uses conduction oil as heating medium to heat, melt, dump and dewater bitumen.

Advantages of Bitumen Melting Equipment

1. The drums loading operation is made by a hydraulic lifting system. The empty drums are pushed out on the back side.

2. The heating required to melt the bitumen is provided by heat conducting oil.

3. The Equipment consists of upper and lower two rooms, The upper one for melting the Bitumen barrels, Surrounded by evenly distributed heating finned tubes, heating pipes and asphalt barrel mainly using the thermal radiation heating mode to melt the Bitumen from the barrels. The lower room is mainly for increasing the heating temperature of the bitumen that melted from the barrels till reach to (120 ℃), then Bitumen outlet pump will transfer the bitumen outside to be ready for use if extend the heating time can be obtained a higher temperature to (160 ℃).

4. Easy to put the barrels inside the equipment without any platforms with high efficiency.

5. No need for trolley or any wrench to carry the barrel inside the plant.

6. Simple structure, no cabinet door, easy to maintain

7. Simple operation, without exhaust gas and changed with induced draft fan.

8. Environmental protection and good: enclosed structure, no pollution.

9. Facilitate the relocation: container structure assembled quickly.

Ser.

System Name

Parameter

Remark

General Parameter

Decanter Dimension

(L×W×H)(mm)

8100×2200×2500


Gross Weight (T)

9


Productivity (TPH)

4


Drums

2×12


Storage Bitumen (m3)

14

METONG

Bitumen Temperature (℃)

110-130


Bitumen pump

YCB-25, 7.5 Kw;

China

Hydraulic Cylinder

HSGL01

CHINA

Hydraulic Station

14926-ZJMT-01-01

CHINA

Heating System

Boiler Dimension

(L×W×H)(mm)

4000×2200×2500


Heat power required (Kcal)

30 x 103Kcal


Control System

Control component

Schneider Component

France

Control program


METONG

Power System

General power (Kw)

< 20

  • Drummed Asphalt Melter (Decanter)
    Drummed Asphalt Melter is very quickly melting equipment for Barreled asphalt. It works with hot oil boiler to features high thermal efficiency, quick dumping, low labor intensity and less pollution.M... Drummed Asphalt Melter (Decanter)
Leave a Message Email Us

we will contact you within 24 hours.

Contact Us
  • +86-571-87177003
  • metonggroup@metong.com
  • Room 2201, Building 2, Qiantang Aviation Mansion, No.6, Shimin Street, Hangzhou, China